High-High Separator Level Shutdown: one SIF from risk to report

A complete, illustrative safety instrumented function taken through the SILProof workflow: LOPA sets the required SIL, the SRS states what the function must do, and SIL verification checks the design against all three IEC 61508 gates. Every number below is calculated by the same engine that runs in the workspace.

Required
SIL 2 · RRF 250
PFDavg
9.509 × 10⁻⁵
Claimed
SIL 2 · target met
Engine
2026.10.1

1 · Risk analysis

LOPA sets the required SIL

Scenario High-high separator level — L-101-HH: High-high separator level can cause liquid carryover into downstream equipment. Consequence: Potential mechanical damage and loss of containment downstream.

StepValueBasis
Initiating causeInlet flow exceeds separation capacity · 0.025 /yrIllustrative data for the worked example
Independent protection layerIndependent high-level alarm with operator response · PFD 0.1Credited: effective, independent, auditable
Independent protection layerSecond independent protection layer · PFD 0.1Credited: effective, independent, auditable
Mitigated frequency2.5 × 10⁻⁴ /yrCause × IPL PFDs
Tolerable frequency (TMEL)1 × 10⁻⁶ /yrIllustrative company risk criterion
Required risk reductionRRF 250 → SIL 2SIF PFDavg must be ≤ 4 × 10⁻³

2 · Safety requirements specification

What the SIF must do

Prevent liquid carryover to the downstream flare/compression system by initiating an independent shutdown on high-high separator level.

RequirementValueVerified by
Detect high-high separator level2oo3 voting from LT-101A/B/C; setpoint defined by process design.Test / Inspection
Initiate safety shutdownSafety PLC shall initiate trip when voting logic is satisfied.Functional Test
Safe stateXV-101A and XV-101B shall move to closed position and isolate separator inlet.Full Stroke Test
Response timeComplete SIF response shall be less than the allocated process safety time.Timing Test
Manual resetManual reset only after initiating condition has cleared and restart conditions are satisfied.Functional Test

3 · Design

Sensor, logic solver and final elements

Failure rates in FIT (λDU / λDD). Final elements: two isolation paths voted 1oo2, each a solenoid in series with an ESD valve.

SubsystemTagModelVotingλDU / λDDType, SC
SensorLT-101A/B/CSP-REF-LT-3002oo360 / 160Type B, SC 3
Logic solverSPLC-101SP-REF-SPLC-1oo2D1oo2D25 / 120Type B, SC 3
Final element · Isolation Path ASOV-101ASP-REF-SOV-241oo2 paths35 / 100Type A, SC 3
Final element · Isolation Path AXV-101ASP-REF-ESD-1501oo2 paths60 / 180Type A, SC 3
Final element · Isolation Path BSOV-101BSP-REF-SOV-241oo2 paths35 / 100Type A, SC 3
Final element · Isolation Path BXV-101BSP-REF-ESD-1501oo2 paths60 / 180Type A, SC 3

4 · SIL verification

Three gates, the lowest governs

GateResultMeaning
Quantitative (PFDavg)9.509 × 10⁻⁵ · RRF 10,516Sensor 2.653 × 10⁻⁵, logic 6.563 × 10⁻⁶, final elements 6.200 × 10⁻⁵. Quantitatively in the SIL 4 band.
Hardware architectureSIL 2Route 1H: the sensor and logic solver limit the claim to SIL 2.
Systematic capabilitySC 3Lowest device SC 3.
Claimed SILSIL 2Lowest of the three gates. Target SIL 2 is met.

A PFDavg in the SIL 4 band does not make that claim on its own: here the architecture gate governs. This is why SILProof reports all three gates rather than the PFDavg alone.

5 · Report

The issued verification report

The report sets out the requirement, the device data with sources, the reliability model and assumptions, the per-subsystem results, sensitivity checks and the three-gate conclusion. It is produced by the same renderer as every member's report.

About this example

Plant, devices and failure rates are illustrative and not for design use. SILProof is engineering support, not certification: real projects need competent, independent review against the applicable editions of IEC 61508 and IEC 61511.