Architecture gate · IEC 61508-2 §7.4.4.3 · IEC 61511-1 Table 6

Route 2H and Table 6

Minimum Hardware Fault Tolerance by target SIL and demand mode. Independent of SFF. Route 2H adds diagnostic-coverage and field-data evidence that Table 6 does not copy.

Route 2H (IEC 61508-2:2010 §7.4.4.3) sets a minimum HFT from target SIL and demand mode. It does not use the Route 1H SFF tables. IEC 61511-1:2016 Table 6 uses the same HFT numbers for process SIS, with IEC 61511 evidence — not the 61508 90% confidence gate.

Minimum HFT (SILProof table)

Target SILLow demandHigh demandContinuous
SIL 1000
SIL 2011
SIL 3111
SIL 4222

SIL 2 with HFT 0 is allowed in low demand only. High demand and continuous require HFT 1 at SIL 2. That is the usual trap when someone copies a low-demand 1oo1 into a high-demand SIF.

What Route 2H still requires

  • The HFT cell above for the target SIL and demand mode.
  • Type B elements: diagnostic coverage ≥ 60%.
  • Field reliability data similar in application and environment, collected to a recognised standard, quantified to greater than 90% confidence (§7.4.4.3). SILProof records that as engineer attestation on the SIF — it does not ingest the raw statistics.

Until that evidence is ticked, SIL verification holds architectural SIL at Below SIL 1 / Review. The calculator tables show the HFT capability only.

How Table 6 differs

Table 6 uses the same minimum HFT grid. It does not apply the IEC 61508 Route 2H >90% confidence criterion. Process-sector evidence sits in IEC 61511 §11.4 / §11.9 records. Do not label a Table 6 claim as Route 2H.

Diagnostic coverage is not used to rewrite PFDavg or PFH in SILProof. DC supports the Route 2H Type B check. Quantitative PFD stays on λ, PTI, PTC, voting and β.

Interactive HFT tables: SFF HFT calculator. Evidence ticks on the SIF: SIL verification. Route 1H SFF tables: Route 1H.